NEW QUESTION 56
True or False: A leading indicator for the length of the feedback loop, for an in progress item, can be its Work Item Age.

  • A. FALSE
  • B. TRUE

Answer: B

 

NEW QUESTION 57
Which of the following will help a Scrum Team achieve flow optimization? (choose the best 4 answers)

  • A. Limiting WIP.
  • B. Padding estimates to allow space in the Sprint Backlog.
  • C. Inspecting and adapting their definition of "Workflow".
  • D. Active management of work items in progress.
  • E. Visualization of the workflow

Answer: A,C,D,E

 

NEW QUESTION 58
Which of the following best describes Kanban? (choose the best answer)

  • A. Additional practices that are integrated into the Scrum framework.
  • B. A process of defining a Scrum Team's workflow in order to increase productivity.
  • C. A strategy for optimizing the flow of value through a process that uses a visual, Work in Progress (WIP) limited pull system.
  • D. None of the above.

Answer: C

 

NEW QUESTION 59
True or False: Cycle Time is used as a leading indicator to determine the length of a certain Product Backlog Item's feedback loop. Choose only ONE best answer.

  • A. FALSE
  • B. TRUE

Answer: A

 

NEW QUESTION 60
Which of the following is NOT a metric of flow for Scrum Teams using Kanban? (choose the best answer)

  • A. Throughput.
  • B. Work in Progress (WIP).
  • C. All of the above are flow metrics.
  • D. Work Item Age.
  • E. Cycle Time.

Answer: C

 

NEW QUESTION 61
Workflow can be thought of as the Scrum Team's policy for which of the following? (choose the best answer)

  • A. Defining when development is complete and validation begins.
  • B. What completed work looks like.
  • C. How to increase the Team's WIP limit.
  • D. How to get work done.

Answer: D

 

NEW QUESTION 62
Which of the following metrics will likely be reviewed by at the Daily Scrum for a Scrum Team using Kanban? (choose the best two answers)

  • A. Throughput.
  • B. Velocity.
  • C. Lead Time.
  • D. Work in Progress (WIP).
  • E. Work Age Item.
  • F. Cycle Time.

Answer: D,E

 

NEW QUESTION 63
True or False: When using Scrum with Kanban you can release multiple times during the Sprint.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 64
A Scrum Team has a Service Level Expectations (SLE) of 85% work items completed in eight days or less.
What is the likelihood of a work item to meet the 8-day SLE cycle if it has just surpassed the 50th percentile workflow stage? (choose the best answer)

  • A. Nothing changes. The level of confidence to meet the SLE remains at 85%.
  • B. The likelihood of meeting the team's SLE decreases.
  • C. The level of confidence to finish the item cannot be forecasted at this point.
  • D. The likelihood of meeting the team's SLE increases.

Answer: A

 

NEW QUESTION 65
Is the Scrum Master role needed for Scrum Teams using Kanban? (choose the best answer)

  • A. NO
  • B. IT DEPENDS
  • C. YES

Answer: C

 

NEW QUESTION 66
In what ways can Work in Progress (WIP) limits help a Scrum Team? (choose the best answer)

  • A. Realization of value sooner.
  • B. All of the answers.
  • C. Provide shorter feedback loops.
  • D. A more sustainable pace.
  • E. Increased collaboration.

Answer: B

 

NEW QUESTION 67
Work Item Age metrics are most helpful in supporting which of the following? (choose the best two answers)

  • A. Inspecting and adapting the team's process and definition of Workflow at the Sprint Retrospective.
  • B. Inspecting and adapting the Sprint at the Daily Scrum.
  • C. Helping the team estimate the size of Work Items.
  • D. Influencing the team's Service Level Expectation (SLE).
  • E. Being a leading indicator for the length of the feedback loop for a certain Work Item.

Answer: B,E

 

NEW QUESTION 68
True or False: Reducing WIP limits will always result in decreased productivity.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 69
When using Kanban in Scrum, a team needs to use which of the following four metrics of flow? (choose the best four answers)

  • A. Work Item Age
  • B. Work in Progress (WIP)
  • C. Cumulative Flow Diagram (CFD)
  • D. Throughput
  • E. Cycle Time
  • F. Lead Time

Answer: A,B,D,E

 

NEW QUESTION 70
To effectively track Work in Progress (WIP), a team should clearly define what it means to have 'started' work and to have 'finished' work. This will typically be included in the Scrum Team's definition of "Workflow" policy.
How are these various points of flow defined? (choose the best answer)

  • A. However the Scrum Team decides to define it. The definition must be in agreement with the Developers and the Product Owner.
  • B. Each point of flow is assigned an owner and will be defined by that owner.
  • C. Product Backlog items that conform with the team's Definition of Ready are considered WIP.
  • D. Any Product Backlog item in the Sprint Backlog that is not 'done' is considered WIP.
  • E. However the Developers choose to define it. They have the final say on managing the Sprint Backlog.

Answer: A

 

NEW QUESTION 71
......